Skip to main content
Parramatta History and Heritage
Home
Home Parramatta History and Heritage

Main navigation

  • Home
  • What we do
    • Council Archives
    • Community Archives
    • Research Library
    • Cultural Collections
    • Media collections
  • Research
    • Our Stories
    • Publications
    • Topics
  • Contact
    • Enquiries
    • Offer a donation
    • Volunteer
    • Copyright and Policies
Search the Library catalogue
Search the Archives & Collections
Where do you want to search?
Search on this website
Archives and Collections
Research library
  1. Home
  2. lennox bridge parramatta time line

Lennox Bridge – Parramatta – Time Line

Lennox Bridge – Parramatta – Time Line
Lennox Bridge – Parramatta – Time Line

The Lennox Bridge, Parramatta (Source: Local Studies Photographic Collection LSOP 896, Parramatta Heritage Centre, City of Parramatta)

Lennox Bridge – Time Line – 1796 to 2016
1790: July – Town of Rose Hill (later Parramatta) marked
1794: First (wooden) bridge over the river at Parramatta Constructed
1795: Wooden Bridge swept away by floodwater
1796: Second Bridge constructed of timber girders on stone piers erected on site of existing bridge.
1802: Two stone bridge piers replaced by timber trestles
1826: Second Bridge sustained further damage but repaired
1832: August 11 – David Lennox arrives in Sydney
1832: October – David Lennox appointed Sub-Inspector of Roads
1833: June – David Lennox appointed Superintendent of Bridges
1833: Lennox reported on deteriorating Condition of second bridge at Parramatta, submitting plans for a replacement structure
1835: July – Second Bridge reported to be in a very insecure state
1836: October 22 – Lennox announced that construction of a new stone bridge to be built alongside the old one would commence in about a fortnight
1836: November 23 – Foundation stone of a new bridge laid by Governor Bourke
1838: March – Bridge only half complete
1838: September – A section of the new bridge was first opened to traffic
1839: Stone arch bridge finally completed at a cost of 1797 pounds
1867: Bridge officially named “Lennox Bridge” by Parramatta Council in honour of its designer
1873: November – David Lennox died and was buried in Parramatta
1885: November – Plans were prepared for the construction of cantilevered foot way on either side of the bridge
1895: February – widening of bridge from 30 feet to 52 feet
1901 – 1902: Width of 10 feet of the stone arch was strengthened internally for the purposes of carrying the Parramatta-Castle Hill Tramway.
1902: August 18 – Tramway opened for traffic
1912: Parapet on the western side was removed and a continuous foot way 5’3″ wide was added to the bridge
1932: Tramway Bridge was closed
1934 – 1935: Bridge was widened.
1976: Lennox Bridge classified by National Trust of Australia (NSW)
1989: December – Lennox Bridge entered on Australian Heritage Commission’s register
1990: February 21 – Lennox Bridge declared a “National Work” under Local Government ActDavid Lennox was born in Ayr, Scotland, and was trained as a stonemason

2014-2016: Successful construction of portals through Lennox Bridge

Neera Sahni, Research Services Leader, City of Parramatta,Parramatta Heritage Centre, 2018

CAPTCHA
 

The City of Parramatta respectfully recognises the traditional owners of the land and waters of Parramatta, the Darug peoples.
Sensitivity notice: Aboriginal and Torres Strait Islander viewers are advised that this website may contain images and voices of deceased ancestors.

Footer

  • Privacy policy
  • Terms, conditions and copyright
  • Accessibility

Follow us:

  • Facebook
  • YouTube
  • Twitter
  • Instagram
  • Pinterest

Produced by City of Parramatta © 2020